link to Home Page

icon Make Shift


Setting out to build a make shift windmill needs to be broken into several needed actions:

  1. What would be the best make shift wind mill or for that mater what is the best water driven generator constructed after the pole shift from commonly available parts?
  2. What is the best before pole shift construction of purchased or available items.
  3. What is the best (most cost effective versus quality) available off the shelf purchasable windmill and the best water powered generator as a fully assembled unit of parts.

Stay away from speculation. Rather than invent it all over again now is the time to scrounge find existing technology. Search the manufactures for what will work cost effectively. Search for those who have done point 1 and 2 above. See and report on how they made it work. We need to start where others have left off. Lets do our home work first.

Offered by Mike.

icon